CASE STUDY: MONITORING OF HIGH SPEED LINE (SNCF)

SNCF
Objective of the project
SNCF’s objective was to measure historical subsidence in its existing high-speed rail network.
InSAR results was compared with existing measurement data to validate InSAR technology.
 
Monitoring of high speed line
Analysis and results

InSAR analysis results have been compared to existing survey data.

Measurement accuracy was +/-4 mm.

SNCF is planning to roll out InSAR methodology to more lines.

InSAR technology might be used to first detect and then monitor weak points of the network.



















The SNCF high-speed monitoring project has proved the accuracy
and precision of InSAR technology.